Deliverables

From NOTTS Project
Jump to: navigation, search

In this page it can be found the complete list of deliverables of the NOTTS project. In addition, All Work Package 2, and some Work Package 7 deliverables are publicly available. The rest of the document are confidential. If you are interested in a specific one, please contact us.

WP1

  • M1.1 Kick-off meeting report
  • M1.2 Mid Term Review Self-Assessment
  • M1.3 Final Review Self-Assessment
  • D1.1 Mid Term Review Report

WP2

WP3

  • M3.1 Description of current OTT service architectures
  • D3.1 Description of OTT service architectures and future scenarios
  • D3.2 Analysis of result impact on architecture design

WP4

  • M4.1 First report on content demand patterns
  • D4.1 Final report on content demand patterns
  • M4.2 Report on distribution schemes for OTT
  • D4.2 OTT content distribution and Caching strategy analysis
  • M4.4 First report on Security aspects of media distribution
  • D4.4 Final report on Security aspects of media distribution

WP5

  • M5.1 State of the art in QoE modelling for OTT services
  • D5.1 QoE models for OTT services
  • M5.2 Preliminary design of OTT QoE monitoring and service supervision tools
  • D5.2 Tools for OTT QoE monitoring and service supervision
  • D5.3 Methods for OTT QoE maintenance and control

WP6

  • M6.1 Definition of interfaces
  • D6.1 Integration of tools and test-bed implementation
  • M6.2 Specification of Prototypes
  • D6.2 OTT Integrated Prototypes

WP7